Beijing Xinlijiji Demonstration Base Project (2011-2012, 120 million)
Project Name: Beijing Xinlijiji Demonstration Base Project Progress: Construction starts Construction and construction period: March 2011 - March 2012 Major equipment: cranes, building materials, exterior wall decoration materials, glass doors and windows, sanitary ware, elevators, Cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instrumentation, water supply and drainage systems, fire protection systems, pipe fittings, water supply equipment, outdoor drainage, construction electrical, lighting fixtures, low-voltage electrical appliances, wire and cable, weak systems, anti- Thunder system, low voltage distribution cabinet.

Project Description:
The project is located in Yizhuang Economic and Technological Development Department of Daxing District, Beijing. It is a comprehensive development with a total construction area of ​​87,391 square meters, including factory buildings and R&D centers.

The total investment of the project is 120 million yuan.

Construction Unit: Beijing Xinliji Vacuum Glass Technology Co., Ltd. Postal address: No. 124, Ciqu Industrial Zone, Tongzhou District, Beijing Zip code: 101111
Contact: Mr. Shi Tel Fax

Construction Unit: Beijing Xinliji Vacuum Glass Technology Co., Ltd. Postal address: No. 124, Ciqu Industrial Zone, Tongzhou District, Beijing Zip code: 101111
Contact: Sheng Jianzhong Telephone Extension 311
fax

Related Developments: Tower Crane Infrastructure Project

Water Pumps

Sewage Water Pumps, Electric Water Pumps, Industrial Water Pumps, Dirty Water Pumps

NINGBO LUBAN ELECTRIC POWER TOOLS CO.,LTD. , https://www.aye-group.com