Model NO.: RMBM16-01601213
Runner: Cold Runner
Design Software: UG
Installation: Semi Fixed
Standard: HASCO
Customized: Customized
Name: Plastic Hanger Mould
Cav Nos: Multi Cavity
Cav&Core Material: P20 / 718
Base Material: 45#
Mould Life: 800,000-1,000,000 Shots
Runner System: Cold Runner Side Gate
Cooling System: Warer Cooling
3D Design: Solidworks
Sample Time: 30-45 Days
Special Service: Weekly Report with Machining Photos
Trademark: REMO
Transport Package: Wooden Case
Specification: SGS certified
Origin: Taizhou China
HS Code: 8410719090
Plastic cloth-hanger mould
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Plastic Cloth-Hanger Mould
Plastic Cloth-Hanger MouldPlastic Cloth-Hanger MouldPlastic Cloth-Hanger MouldPlastic Cloth-Hanger MouldFollowing information is essential for your better understanding on our moulds
Name Description
Products' infomation we need to make quotation Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc
Mould Base LKM, HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould Design 3D/2D Drawing
Design Days 3 days
Design Software UG, PROE, CAD, CAE, CAM, CAXA ect
Plastic Material PP, PC, PS, PE, PU, PVC, ABS, PMMA ect
Mould Life 300, 000-3, 000, 000 shots
Injection System Pin-point-gate
Polish System Mirror Polish
Payment 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time 15-60days
Specification Depends on customers requirements
Business Step 
1. R& D We support customer R& D. Make the files or improve the design if you needed 
↓ ↓ ↓
2. Quotation Making Mould Quotation will be finished in 1 day according to information we get
↓ ↓ ↓
3. Negotiation  The quality, price, material, delivery time. payment item. ect 
↓ ↓ ↓
4. Mould Design  3-5 days for mould and product 3D/2D drawing design
↓ ↓ ↓
5. Mould According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days 
↓ ↓ ↓
6. Mould Testing When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.
↓ ↓ ↓
7. Sample shoot  If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory 
  ↓ ↓ ↓  
8. Delivery  Delivery goods by sea or by air, according  customers requirement 
Â