Runner: Cold Runner
Design Software: UG
Installation: Fixed
Standard: HASCO
Customized: Customized
Name: 4 or 5 Layers Shoe Rack Plastic Injection Mold
Cavity & Core Material: H13 / 2738 / 2316
Mould Base Material: SAE1045 Steel
Mould Life: 1,000,000 Shots
Cooling System: Water Cooling
Sample Time: 45-60 Days
Sprue Gate: Side Gate
3D Format: X_T / Igs / STP / Sldprt / Step / Stl / Dwg / etc.
Service: Logistics
Courier Service: Sample Via TNT / DHL
Trademark: REMO
Specification: International Standard
Origin: Taizhou, China
HS Code: 8480719090

4 or 5 Layers Shoe Rack Plastic Injection Mold


4 or 5 Layers Shoe Rack Plastic Injection Mold

As a professional plastic mold manufacturer based in China, we specialize in developing new molds for a wide range of plastic products. Our mold quotations are prepared within one day and sent to clients for review. We guarantee the quantity and delivery time as per your requirements.

Below is some essential information to help you understand our mold capabilities better:

Product Information Needed for Quotation: Clear images, material type, dimensions, weight, wall thickness, target production quantity, and more.

Mold Materials: 45#, 50#, P20, H13, 718, 2738, NAK80, S136, SKD61, and others.

Mold Base: LKM, HASCO, and similar standards.

Cavity Type: Single or multi-cavity.

Runner Type: Hot or cold runner.

Mold Design: 3D or 2D drawings.

Design Time: Typically 3 days.

Design Software: UG, PROE, CAD, CAE, CAM, CAXA, and more.

Plastic Materials: PP, PC, PS, PE, PU, PVC, ABS, PMMA, and other common types.

Mold Life: Ranges from 300,000 to 3,000,000 shots.

Injection System: Pin-point gate.

Polishing: Mirror finish available.

Payment Terms: 40% deposit via T/T, 60% balance upon completion.

Delivery Time: 15–60 days depending on complexity.

Specifications: Customizable according to customer needs.
Business Steps
1. R&D We support product development and design improvements as needed.
↓ ↓ ↓
2. Quotation Mold quotation is completed within one day after receiving product details.
↓ ↓ ↓
3. Negotiation Discuss quality, price, materials, delivery time, and payment terms.
↓ ↓ ↓
4. Mould Design 3–5 days for 3D/2D drawing design.
↓ ↓ ↓
5. Mould Production Molds are built according to customer specifications. A preliminary design is sent for approval before production starts. The typical lead time is 25–60 days.
↓ ↓ ↓
6. Mould Testing After the mold is completed, it is tested to ensure it meets the client's requirements. Sample parts are provided for review.
↓ ↓ ↓
7. Sample Production If the first sample does not meet expectations, we make necessary adjustments until the client is satisfied.
↓ ↓ ↓
8. Delivery Products are delivered by sea or air, based on the customer’s preference.
 

Nonwoven Garment Bags

Non Woven Garment Bags,Non Woven Garment Bags Wholesale,Non Woven Garment Bags For Sale,Non-Woven Bags

JIANGSU KIND UNDERSTAND NEW MATERIAL TECHNOLOGY CO.,LTD , https://www.kindunderstand.com